Easy Washer Fix

Home  /  Installation

Installation · uninstallation · shifting

Washing machine installation, done the way the manual intended

Most shaking, leaking and error codes on a new washer trace back to a rushed installation. We set your machine up properly — bolts out, level, plumbed, earthed and test-run — so it lasts the years it was designed for.

White front-load washing machine installed beside a white wooden cabinet

Our installation checklist

Seven steps we never skip

01

Unbox & inspect

We check the cabinet, drum and door for transport damage before anything is connected, so any claim with the shop stays valid.

02

Remove transit bolts

The shipping bolts that lock the drum are removed and handed to you — keep them for your next move.

03

Level & stabilise

Adjustable feet are set with a spirit level on a firm surface or stand, so the drum spins smoothly at full speed.

04

Test-run with you

A short wash and a full-speed spin, while we walk you through the programs and daily care.

STEP 05

Inlet connection

The inlet hose is fitted to a proper washer tap with a fresh washer and hand-tight fittings, then checked for drips under pressure.

STEP 06

Drain routing

The drain hose is set at the correct height to prevent siphoning, secured to the floor trap or standpipe, and tested at full pump flow.

STEP 07

Electrical safety

We check the socket for a working earth and sensible load, and advise on a voltage protector where supply is unstable.

Before we arrive

A quick checklist for Dhaka flats

Most buildings in Dhaka weren’t designed with a washing machine in mind, so a few minutes of preparation saves time on the day. If anything below isn’t in place, tell us when you book — we can usually sort it out during the visit.

  • A dedicated tap within 1.5 m of the machine’s position
  • A floor drain or standpipe for the drain hose
  • A three-pin earthed socket, not an extension board
  • A flat, solid floor or a raised stand in wet bathrooms
  • Enough clearance behind for the hoses — about 10 cm
  • The door or lid able to open fully
  • Rooftop tank pressure: at least a steady flow from the tap
  • The machine’s box and manual kept for the warranty
Laundry area with a sink, washer and dryer set up side by side
White front-load washing machine ready for installation in a home

Moving flats?

Shifting without the broken drum

Moving a front-loader without re-fitting its transit bolts is one of the most common ways machines get damaged in Dhaka. On a truck, an unlocked drum swings freely on its springs and can crack the dampers, dent the tub or tear the bearings.

Our shifting service covers both ends of the move. We drain the pump and hoses completely, lock the drum, cap the hoses and prepare the machine for your movers. At the new flat, we reinstall it with the same seven-step checklist — including a new drain route if the bathroom layout is different.

If you’ve lost the transit bolts, we can usually supply the right ones for your model.

Installation pricing

One fair price for most homes

Standard installation is ৳1,000 for any brand when a tap, drain point and earthed socket are already in place. Extra plumbing — a new tap, a longer inlet hose, a wall bracket for the drain — is quoted on site before we start. Shifting (uninstall and reinstall anywhere inside Dhaka) is ৳2,000, excluding transport.

Standard install ৳1,000Shifting ৳2,000Stand fitting ৳500

Set of mechanic hand tools laid out for an installation job

Installation FAQ

Common installation questions

The shop offered free installation. Why would I pay you?

Many shops send a delivery helper rather than a technician. If you’ve had shaking, leaking or error codes since day one, a proper installation check usually solves it. We’re also happy to inspect a shop installation for the regular visit fee.

Can you install a machine on a balcony?

Yes, as long as it’s protected from direct rain and sun, the floor can take the weight, and there’s a safe electrical and water connection nearby. We’ll advise on covers and stands.

Do you install dishwashers or dryers too?

We install stand-alone tumble dryers and washer-dryer combos. We don’t install dishwashers or built-in kitchen appliances.

How long does an installation take?

Around 45 minutes for a standard setup. Add another 30–60 minutes if new plumbing is needed.

New machine arriving this week?

Book installation for the same day as delivery — we’ll coordinate with the shop’s delivery time where we can.

Scroll to Top